(to return to the projects page - just close this window) |
Projects - Photo 3 - Los Altos Hills, CA | |||
|
The pump operator said he has never seen a system like the EZ-Ply® system. There was 140 cubic yards pumped in 3-1/2 hours. "Nothing moved, this is a great system", he said. Contractors and pump operators alike appreciate the strength and safety of this system. |
Previous | Next |
Copyright © 2004 - 2020 |