Intro Photo 1 Photo 2 Photo 3
Photo 4 Photo 5 Photo 6

(to return to the projects page - just close this window)


 Projects - Photo 3 - San Jose, CA
Always start at a corner then place the forms along the chalk line @ 10:00am

Both the inside and outside panels can be set at the same time.  This makes the job very quick and easy.


Previous   Next
     
Copyright © 2004 - 2020