Photo 1 Photo 2 Photo 3 Photo 4 Photo 5
Photo 6 Photo 7 Photo 8 Photo 9 Photo 10

(to return to the projects page - just close this window)


 Projects - Photo 6 - Grass Valley, CA
The first pour is a very low slump.

 

The pump man carefully fills the forms with about 18 inches of concrete (9 foot high wall).  This holds the system in place taking care not to "float" the forms.


Previous   Next
     
Copyright © 2004 - 2020