 Projects - Photo 7 - Grass Valley, CA
Finishing the footings while the first pour is starting to setup.

After placing the low slump mix as the first shallow pour, the pump man finishes the footings at the base of the EZ-Ply® system.  This gives the first pour time to set and when ready, remove some of the stakes.