 Projects - Photo 1 - Los Altos Hills, CA
First time using the EZ-Ply sysem and completed the job in two work weeks!

The modular design of the EZ-Ply® system makes it ideal for difficult tasks such as radius walls.  This project has two radius walls, one with a 6' radius and the other 12'.    There is 400 ' of wall from 11' to 11'-8" high with an 8" step-down/ups for "light wells".  The walls alone contained 134 cubic yards of concrete.  The contractor set the outside forms first, then installed a tremendous amount of rebar before setting the inside forms.